ANALISIS ARUS TIGA FASA DAYA 197 KVA DENGAN MENGGUNAKAN METODE UJI NORMALITAS KOLMOGOROV-SMIRNOV

Authors

  • Agus Pramono Universitas Amikom Purwokerto
  • Teppei Jordy L'ga Tama Universitas Amikom Purwokerto
  • Teguh Waluyo Universitas Amikom Purwokerto

DOI:

https://doi.org/10.31598/jurnalresistor.v4i2.696

Keywords:

Arus Listrik, 3 Fasa, Uji Normalitas, Kolmogorov-Smirnov

Abstract

It is necessary to make a monitoring system for the amount of electricity that includes voltage, current, power and the amount of electricity consumption. In this research, carried out in a building that has a 3-phase current with a power of 197 KVA. The analysis used the Kolmogorov-Smirnov normality test method. The Kolmogorov-Smirnov normality test compares the current distribution in the building with the current which is transformed into a Z-score form and is assumed to be normal. In the data analysis, the results of Asymp. Sig. (2-failed) has a value of 0.2. This, this shows the data has been normally distributed

Downloads

Download data is not yet available.

References

Arikunto, Suharsimi. 2010. Prosedur Penelitian Suatu Pendekatan Praktek. Jakarta: Rineka Cipta

Cekdin, Cekmas & Taufik Barlian. Rangkaian Listrik, Penerbit ANDI, 2013.

Fowler, Richard J. Electricity Principles & Applications, Penerbit McGraw-Hill, 2008.

Sujianto, Agus Eko. 2009. Aplikasi Statistik dengan SPSS 16.0. Jakarta : PT. Prestasi Pustaka

Tahir, Usman. 2017. Studi Pemanfaatan Alat Ukur Avometer Analog Sebagai Unit Model Pengujian. Jayapura: Jurnal Dinamis (Vol 1 No 12 Juli (2017)

Downloads

Published

2021-10-28

How to Cite

Pramono, A., Tama, T. J. L. ., & Waluyo, T. (2021). ANALISIS ARUS TIGA FASA DAYA 197 KVA DENGAN MENGGUNAKAN METODE UJI NORMALITAS KOLMOGOROV-SMIRNOV. Jurnal RESISTOR (Rekayasa Sistem Komputer), 4(2), 213-216. https://doi.org/10.31598/jurnalresistor.v4i2.696